The newly-installed copper roof panels and dome have begun to patinate, naturally changing color to match the other roofs across campus.
All infrastructure is in place and blacked out in the planetarium dome. Soon, this will all be covered behind the planetarium's projector screen.
Lab tables have been installed in biology labs with ventilation snorkels overhead.
The glass connector will serve as a walkway and study space between the Winn Science Center and McDermott-Green Science Building.
Workers finish the ceiling and curved lighting in the lecture hall.
Faucets and valves will provide air, water, and gas for experiments in the chemistry and biology labs.
The three-biome greenhouse nearly completion.
The flooring around the second story commons is prepped for terrazzo installation.
Once finished, the common area's large open wall will be outfitted with an LED screen.
Workers finish installing curved copper panels to the Winn Science Center's dome.
Works is nearly completed on the copper dome and roof.
1/11
Learning Spaces Take Shape
From the outside, the Winn Science Center appears nearly complete. Inside, work on the classrooms and labs is just beginning. As countertops, sinks, cabinets, lab tables, and more are installed, the endless educational possibilities of the Winn Science Center are becoming evident.